The signals will be in operation on four consecutive Sundays commencing 5 May 2013, between 01.00am – 05.30am. These are the only times that the work can be carried out without impacting on the Metrolink services.
Description of Work: Cleaning out Level Crossing Panels and Inserting Flat Irons to Close Gaps in Level Crossing
Emergency Contact & Telephone Number in the Event of Traffic Signal Failure: Brian Birmingham 07899 906 814