These will be placed at two locations.
The signals are required in order to carry out trial hole investigations for gas main replacement at some later date yet to be determined.
They will be in place for one day only on February 18 and will operate off peak (9.30am-3.30pm) and at one location at a time.
In case of signal failure ring: 0161 790 3000 / 0800 121 4444